Beta
  • With such a wealth of information here at SWAN, we want to make it easier for you to find the knowledge you seek as quickly as possible.

  • Lighthouse uses some of the most advanced AI language models to understand your questions and sifts through SWAN's entire knowledge base to find an answer. We have carefully trained it to present relevant information in a consolidated way.

  • As you navigate an ocean of information, let Lighthouse be your beacon.

  • Disclaimer: We cannot always guarantee complete or accurate responses, given that AI-powered dialogue is still an emerging technology. Lighthouse will always accompany answers with the most relevant references, which we encourage you to check out. We highly value your feedback to ensure that Lighthouse meets the highest standards of quality and reliability. If you notice something off, please contact us at: info@swan-forum.com.

  • Ready to join us?

    SWAN Members enjoy full access to Lighthouse (unlimited searches and gated content) along with global membership benefits.

Looking for classic search?

Case Study

Guiding Operations and Investment With Digital Twins

Ensaras Digtal Twin Optimises Biogas Upgrading Operations and Investment Decisions in India

AUTHOR

Related Topics

AI/Machine Learning

Remote Monitoring

Regulatory Compliance

Circle CBG operates a 14.6 TPD compressed biogas plant in Meerut, Uttar Pradesh, India, converting sugar-mill press mud and cattle manure into vehicle grade CBG for the National Capital Region. The plant has been in production since August 2024, and is in the process of expanding to 24 TPD.

THE CHALLENGE

Gas quality, methane recovery, and energy use at the plant depend on tightly linked compression, chilling, and membrane settings, so changes that raise output can push product gas off-spec or strain equipment. The operations team had no safe way to test changes before implementing them, and management had limited visibility into how operating decisions affected revenue. With an expansion underway, the plant also needed to understand its true bottleneck to direct investment where it would matter most.

THE SOLUTION

Ensaras built a digital twin of the biogas upgrading system, based on a process model and mass balance and calibrated to live SCADA and PLC data. Engineers and management test what-if scenarios (feed pressure, gas temperatures, chiller configuration, and membrane module allocation) and see the predicted impact on gas quality, yield, energy use, and operating margin, with equipment limits checked in every scenario. Recommendations are reviewed by operations before implementation.

RESULTS

The digital twin allowed the operations team and management to model the maximum CBG production potential of the installed equipment, identifying that expanding chiller capacity (and not membrane area alone) is the lowest-CAPEX path to increasing CBG production. Operating decisions are now evaluated using the digital twin before implementation, allowing for calibrated model-based decision making to maximise the productivity of existing assets.

At a Glance

Challenge:

  • To understand how
    operating changes in a
    biogas upgrading system
    affect gas quality, yield,
    and plant margin

Benefits:

  • Financial impact visible
    before changes are made
  • Identified lowest-CAPEX
    expansion path
Featured SWAN Members: