Beta
  • With such a wealth of information here at SWAN, we want to make it easier for you to find the knowledge you seek as quickly as possible.

  • Lighthouse uses some of the most advanced AI language models to understand your questions and sifts through SWAN's entire knowledge base to find an answer. We have carefully trained it to present relevant information in a consolidated way.

  • As you navigate an ocean of information, let Lighthouse be your beacon.

  • Disclaimer: We cannot always guarantee complete or accurate responses, given that AI-powered dialogue is still an emerging technology. Lighthouse will always accompany answers with the most relevant references, which we encourage you to check out. We highly value your feedback to ensure that Lighthouse meets the highest standards of quality and reliability. If you notice something off, please contact us at: info@swan-forum.com.

  • Ready to join us?

    SWAN Members enjoy full access to Lighthouse (unlimited searches and gated content) along with global membership benefits.

Looking for classic search?

Case Study

Optimising Asset Solutions in a Capital-Constrained Environment

Greater Wester Water, Australia & Optimatics Case Study

AUTHOR

Related Topics

Master Planning

Network Optimisation

Greater Western Water (GWW) is a water retailer in Melbourne, Australia, providing water, recycled water supply, sewerage, and trade waste services for approximately 630,000 residential and non residential customers in Melbourne’s west and northwest.

THE CHALLENGE

GWW partnered with Optimatics to optimise solution development during the master planning phase. Their initial proposed plan to increase the compliance of the Youell Street catchment was estimated to cost approximately $9.5 million. However, during the design phase of the works, the cost increased considerably, and a review of the proposed solutions was required. GWW then engaged in a pilot program with Optimizer to analyse the capacity for growth in sub-catchments and refine the initial interventions proposed by the GWW team.

THE SOLUTION

The study evaluated flood and spill responses under various pipe blockages (25%-100%) using the 2021 population scenario, identifying critical pipes. It also analysed population growth projections for 2028, 2033, 2043, and 2072, aiming to maximise growth while minimising hydraulic penalties. Master planning included three phases: Phase 1 reduced 2023 hydraulic challenges by half with a 300K AUD investment, Phase 2 minimised these challenges with a $3M investment (68% less than the initial $9.5M plan), and Phase 3 targeted 2072 challenges with an additional $4M investment.

RESULTS

  • Reduced overall estimated cost by 21% (from $9.5 million to $7.5 million).
  • Reduced modelled spills to zero in the scenario of year 2072.
  • Staged delivery of infrastructure enabling deferral of more than half of the capital investment.

KEY POINTS

  • Identify critical pipelines and assess the impact of population growth
  • Determine necessary interventions for both current and future scenarios
  • Enhance solutions to provide better outcomes for customers and the community
  • Ensure GWW meets its compliance responsibilities to ultimately build network resilience